Request for Proposals: Preparation of an Infrastructure Master Plan

Bowen Island Municipality seeks proposals from qualified and innovative engineering infrastructure planning consultants to provide professional services to review existing reports and documents, undertake an Island-wide infrastructure gap analysis, make recommendations, and create an integrated Infrastructure Master Plan. This plan will document existing infrastructure, estimate the required investments necessary to optimize and extend the lifespan of current assets, identify required capacity for both existing and proposed infrastructure, and provide a prioritized action plan for strategic future infrastructure investments for the next 5, 10, and 20 years (the planning horizon), with particular emphasis given to the next 5 years.

BIM-RFP-2017-010: Preparation of an Infrastructure Master Plan

Attached Reports:

2009 Cove Bay Long Range Plan

2013 Snug Cove Wastewater Treatment Plant Assessment

Asset Valuation and Inventory Report

Bowen Island Water Affordability Study

Cove Bay Water Conservation Plan

GVRD-SCV Sewerage Study

Report 130812 - Snug Cove Inspection

Report 130813 - Mt. Gardner Wharf Inspection

Snug Cove Wharf Drawings and Documentation

Seaside Elevated Boardwalk CRC - Allester Engineering Report

Wednesday
26
Powered by CivicWeb CMS - © Copyright 2014 iCompass Technologies Inc.